球探网足球数据比分

Application area
Position: Home > Applications > Municipal Construction

Municipal construction

Main achievement

Shanghai Rail Transit Line 2 is the second underground railway line in Shanghai. It began operation on June 11, 2000. The line runs from Xujing East Station in Qingpu District, passes Nanjing Road known as the First Street of China, crosses the Huangpu River, reaches Zhangjiang Hi-Tech Park in Pudong New Area, and then passes through Tang Town, Chuansha and other places, and finally reaches Shanghai. Contacting Pudong International Airport in Dakong can be said to be a link between Shanghai's past and future. Line 2 is 64 kilometers in length and has 30 stations. It operates for 18 hours and 11 minutes a day, and Japanese passengers have exceeded 1.57 million.


  • Shanghai Rail Transit Line 2
  • Iraq ashite power plant
  • Lintong City Water Supply
  • Chongqing Light Rail Lines 1 and 3
  • Qinghai Haibei Heating Project
  • Liaoning Shenyang Drainage System
  • Jinan Olympic Sports Center
  • Suzhou Social Security Center
  • Harbin Water Supply and Drainage Group
  • Xinjiang Uygur Autonomous Region People's Hospital
  • South to North Water Transfer in Hebei Section
  • Honghe Drainage Station
  • Suzhou City Flood Control Project
  • Guizhou Safe Drinking Water Project
  • Gezhouba Group
  • Ningxia Water Investment Group
  • Huadian Engineering
  • Qingshuichuan Coal Power Plant
  • Xinjiang Coal-fired Heating and Clean Energy Transformation
  • Tongfang Energy Conservation Project
  • Rieter heating
  • New Energy Technology
  • Changchun Gas
  • Wujieqiao Pumping Station
  • Dashuigang irrigation drainage
  • Yanzigang Pumping Station
  • Dayudu Pumping Station
  • Drainage project of Henan Dongmeng River rainwater pump
  • Kaifeng rainwater pumping station
  • Qingyun Drainage Station
  • Begonia drainage pump station
  • Jindi River Treatment Project
  • Daoyuanzhong Drainage Station
  • Dongguan Qiaohe Drainage Station